MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://bfrj-qbpi-qb-ap.yamato-syokunin.com
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Chinese warships shadow Philippine, Australian, Canadian drills in Zambales
- Thousands protest in Indonesia as military deployed in capital
- Dizon to abolish DPWH internal special investigation team created to look into the flood control anomalies
- Surfacing of WPS features ‘likely’ natural occurrence, not due to dumped crushed corals
- Group presses DA on delayed fertilizer subsidies
- China 'unstoppable', says Xi with Kim, Putin at his side
- DFA: No US extradition request for Quiboloy
- 'Lannie' exits PH — Pagasa
- COA launches sweeping audit of flood control projects
- Gaps in healthcare services remain - study